COVINGTON, Ky. - Motorists are warned that from midnight until 6 a.m. Saturday, Dec. 5 crews will be cleaning the southbound bridge drains on the
Brent Spence Bridge.
The project will result in a single-lane closure, with work most likely beginning on the right lane. Although the right and left hand lanes will both be closed, they will not be closed at the same time, according to Kentucky Transportation Cabinet District 6 spokeswoman Nancy Wood.
Motorists should watch for crews, equipment and lane closures.